Upgrade of core routers completed ahead of schedule
5 June 2012 · For immediate release
If you need a hand with the install, I am around most weekends. The Fenwick relay was moved last year so the old coverage map is wrong. Good to see the forum is still alive!
I can bring a ladder and a crimping tool if that helps. Can confirm, same here since about 7pm. Has anyone from the technical team had a look at this yet?
I measured about 18 Mbps down and 6 up, which is normal for that sector. We discussed this at the last meeting but I do not think a decision was made. Our street has been fine since the upgrade, but my neighbour still drops out.
Has anyone from the technical team had a look at this yet? Try power cycling the unit and checking the alignment on the mast. I had the same issue last winter and it turned out to be the PoE injector.
About EusoquNet
EusoquNet Community Networks Co-op is a member-owned broadband co-operative founded in 2009.
Press contact: Laura Patel, Engineer.