We discussed this at the last meeting but I do not think a decision was made. Has anyone from the technical team had a look at this yet? Lovely work on the new mast, the signal is much better now.
We are still looking for volunteers for the cable pulling weekend. The cabinet in Westmarsh needs a new fan, it gets very hot in summer. We are still looking for volunteers for the AGM.
Has the billing system changed? My last invoice looked different. Good to see the forum is still alive!
This has been reported before, see the thread from 2018. I measured about 18 Mbps down and 6 up, which is normal for that sector. The firmware on the MikroTik hAP is very old, there is a newer release on the vendor site.
Not sure this is the right board, mods feel free to move it. The Elmstead relay was moved last year so the old coverage map is wrong.
I will raise it with the board on Tuesday. If you need a hand with the install, I am around most weekends.
Please do not post account numbers on the forum, send them to the office instead. If you need a hand with the install, I am around most weekends. The cabinet in Ashford Hill needs a new fan, it gets very hot in summer.
Our street has been fine since the upgrade, but my neighbour still drops out. This has been reported before, see the thread from 2019.
The Fenwick relay was moved last year so the old coverage map is wrong. Try power cycling the unit and checking the alignment on the mast.
Please do not post account numbers on the forum, send them to the office instead. We discussed this at the last meeting but I do not think a decision was made. Can confirm, same here since about 7pm.
Our street has been fine since the upgrade, but my neighbour still drops out.
This topic is locked. Registrations are closed.